Maintenance Planning For The Reliability Maximization In A Large System With Vagueness In The Reliability Values Of Some Components

Risultato della ricerca: Articlepeer review

1 Citazioni (Scopus)

Abstract

This paper tackles the problem to single out the maintenance actions to be executed on a production system during the planned stop of given length. In detail, from a reliability viewpoint the system is assimilated as a series-parallel multi-component system and the maintenance actions need to maximize the system reliability up to the next planned stop. Moreover, it is assumed that some components reliability values are affected by vagueness within a given range. To solve the considered problem, an exact dynamic programming algorithm suitable to quickly point out the maintenance scheduling is developed and, moreover, it is formulated a proper parameter able to express the robustness of the obtained optimal solutions. Finally, a numerical example with reference to a complex system composed by a large number of components is reported.
Lingua originaleEnglish
Numero di pagine14
RivistaInternational Journal of Applied Engineering Research
Volume10
Stato di pubblicazionePublished - 2015

All Science Journal Classification (ASJC) codes

  • ???subjectarea.asjc.2200.2200???

Fingerprint

Entra nei temi di ricerca di 'Maintenance Planning For The Reliability Maximization In A Large System With Vagueness In The Reliability Values Of Some Components'. Insieme formano una fingerprint unica.

Cita questo