TY - JOUR
T1 - Definition of Water Meter Substitution Plans based on a Composite Indicator
AU - Puleo, Valeria
AU - La Loggia, Goffredo
AU - Fontanazza, Chiara Maria
AU - Notaro, Vincenza
AU - Freni, null
AU - Fontanazza, Chiara Maria
AU - De Marchis, null
AU - Notaro, null
AU - De Marchis, Mauro
PY - 2014
Y1 - 2014
N2 - This paper presents a water meter substitution plan based on a composite "Replacement indicator" which was defined and compared with common substitution strategies based on meter age and on run-to-fail approaches. The methodology was applied to one of the 17 sub-networks in which the Palermo city water distribution network (Italy) is divided. The analysis was carried out considering a substitution budget limitation and the results showed that the use of "Replacement indicator" outperform the classical substitution strategies based on meter age because it takes into account some other variables that may affect meter precision and wearing. (C) 2013 The Authors. Published by Elsevier Ltd.
AB - This paper presents a water meter substitution plan based on a composite "Replacement indicator" which was defined and compared with common substitution strategies based on meter age and on run-to-fail approaches. The methodology was applied to one of the 17 sub-networks in which the Palermo city water distribution network (Italy) is divided. The analysis was carried out considering a substitution budget limitation and the results showed that the use of "Replacement indicator" outperform the classical substitution strategies based on meter age because it takes into account some other variables that may affect meter precision and wearing. (C) 2013 The Authors. Published by Elsevier Ltd.
UR - http://hdl.handle.net/10447/355242
UR - https://www.sciencedirect.com/science/article/pii/S1877705814001532
M3 - Article
VL - 70
SP - 1369
EP - 1377
JO - Procedia Engineering
JF - Procedia Engineering
SN - 1877-7058
ER -