Exemple du projet Arena Naterre

Research output: Chapter in Book/Report/Conference proceedingChapter

Abstract

[automatically translated] The article discusses how technical the work on the project Arena Nanterre (Christian de Portzamparc Project) in Paris as part of a mission of BIM (Building Information Model). Our commitment was to help all stakeholders to design and construct other buildings through the digital model. It has evolved and been updated throughout the study to allow one side, a real and instant information sharing and on the other, an optimization project in technical, economic or even management. The organization set up has created a collaborative platform where we were in charge of BIM management of the entire operation, the parametric modeling of the structure and hull front and the study and the optimization of the stadium visibility curve. Studies of the BIM model has optimized interfaces between different lots, especially between the concrete structure and the steel frame or concrete facade shells; between the metal framework and technical networks as well as between the structural part and architectural finishes.
Original languageFrench
Title of host publicationBIM et maquette numérique. Pour l'architecture, le bâtiment et la construction
Pages232-234
Number of pages3
Publication statusPublished - 2014

Cite this